Skip to content

Lining / Board mass

Supporting materials

Fermacell Gypsum Fibre Board — square edges

The mass behind
the finished room.

A 600 × 2400 × 12.5 mm gypsum fibre board for the selected lining build-up. Combine the board layers, fixings, joint treatment and Compound Red with the ProSilence isolation system.

For project specification and partner enquiries. No direct checkout.

Fermacell Gypsum Fibre Board — square edges
SUPPORTING THE SYSTEM4763/50390794

PURPOSE / PRINCIPLE / APPLICATION

01 / Specify the assembly.

Board mass is one part of isolation.

Use the layer arrangement required by the project, with support spacing, screw lengths and perimeter detailing matched to that arrangement. A single board does not carry a universal Rw rating and is not an automatic substitute for two layers in a tested assembly.

02 / Finish the correct edge.

Square-edge joint planning.

Select the compatible Fermacell jointing method for the square-edge board. Joint adhesive and perimeter sealant have different roles; neither replaces the damping layer between two boards.

03 / Equipment loads.

Backing and fixing matter.

Plan equipment mounts with appropriate reinforcement and the board manufacturer’s fixing guidance. Neither board strength nor the load capacity of a FluxCore Clip is a blanket rating for a single screw, projector or loudspeaker mount.

04 / Plan quantities.

Boards, layers and allowances.

Use the System Planner for the selected surfaces and layers. One board covers 1.44 m² before layout and cutting considerations. Local supply formats may differ; confirm the specified board, not just its nominal area, before substituting materials.

FROM CONCEPT TO SPECIFICATION

The right document.
The right construction.

Request the current product information and installation details for the component and revision you are specifying. Performance belongs to the documented assembly; load and acoustic measurements have separate scopes.

Request technical documents ↗
01

Define the room.

Start with the surfaces, use, space and equipment loads.

02

Choose the build-up.

Confirm components, supporting materials and local requirements.

03

Share the plan.

Use the System Planner to prepare an initial quantity schedule.